Which Village permit your pour needs, and which it doesn't
The Village of Pinehurst, in Moore County, runs its permits through the Planning & Inspections Department and an online Permit Center. Its permit guide says a driveway permit applies to a brand new driveway, adding a new entrance, changing the apron material, or widening the pad or a parking area. You don't need one if you're only changing the surface material, the apron is untouched and the footprint stays the same size.
A patio, walkway or terrace is a different permit. The guide says it covers new or expanded patios and walkways in gravel, paver, concrete and other impervious surface. So a job that widens the pad and adds a front walk means two permits, not one. We sort that out on the walk-through and list each permit in the estimate. You apply and pay online, and inspections get scheduled there too, and the Village wants 48 hours' notice before the final inspection, so keep the case number handy. For the NC basics on who issues what, our permit guide is the place to start.
What the Village's application makes you measure
The Village's driveway application asks for the apron type, asphalt or concrete, plus any pipe and riprap, the zoning district, a site plan, and your existing and proposed impervious surface percentage. It says the Village wants 48 hours' notice for the final inspection. It also lists other approvals that may apply: a Floodplain Development Permit in a flood zone, a Certificate of Appropriateness in the Historic Preservation Overlay District, an NCDOT permit on state roads and a Right of Way Encroachment agreement.
Trees and walls count too. The Village says a tree removal permit is generally not needed, but a tree in the Village right-of-way needs Public Services approval, and extensive grading may need a development permit. The Village lists any fence, wall, enclosure, driveway column or retaining wall over 18 inches tall as its own permit item, so a pair of brick piers at the entrance isn't a free add-on. The Village says a survey is required for new construction, additions and anything with a permanent foundation. It doesn't list one for flatwork alone. We take our own measurements anyway. The impervious percentage on the form is only as good as the square footage behind it.
Pours are priced by the square foot, $7 to $12 per sq ft for broom finish, $12 to $20 per sq ft for stamped, and tear-out of an old pad adds $1.50 to $4 per sq ft. The sizes below are examples, not quotes.
| Job | Size | Per sq ft | What it comes to |
|---|---|---|---|
| Two-car broom-finish pad | 24x30 (720 sq ft) | $7 to $12 | $5,040 to $8,640 |
| Tear-out and haul-off of the old 24x30 pad | 720 sq ft | $1.50 to $4 | $1,080 to $2,880 |
| Stamped entrance apron | 10x20 (200 sq ft) | $12 to $20 | $2,400 to $4,000 |
| R-8 style 18 foot wide entrance, 60 feet long | 18x60 (1,080 sq ft) | $7 to $12 | $7,560 to $12,960 |
Square-foot math only. Slope, base depth, trees and what the Village requires at the apron move the number. We give a free written estimate after we see the site.