Concrete contractors in Pinehurst answer to a Village, not a town
Under North Carolina law Pinehurst is a Village in Moore County, and the Village of Pinehurst Planning and Inspections Department runs the permit desk. Applications, payments and inspection requests all go through its online Permit Center. Its permit list names patios and driveways outright. Any fence, wall or retaining wall over 18 inches tall is on there too.
A brand new driveway needs a permit. So does a new entrance, a wider apron or a changed apron material. A new or expanded patio, walkway or terrace needs one as well, and the Village counts concrete, gravel and pavers alike. Start with the Village's building permit page, then call us for the pour. Our permits guide covers the rest of the region. Here we stick to what changes inside the Village limits.
Patio permit, driveway permit: how the Village splits them
Say you want a new rear patio and a wider driveway apron. Concrete patio installation in Pinehurst starts with the patio permit, and the apron needs its own. If you hire concrete contractors in Pinehurst for both, expect two applications. The Village's which-permit guide puts it this way: the patio permit covers a "new or expansion of patio, walkway, terrace etc." and counts gravel, paver and concrete alike. The driveway permit covers a brand new driveway, a second entrance, widening, and changing the apron material.
Swapping the driveway surface is the exception. Leave the apron alone and keep the same footprint, and the guide says the driveway permit isn't required. When you file, the driveway application asks for the apron type (asphalt or concrete), pipe and riprap, the existing and proposed impervious percentage, the zoning district and a site plan. The Village wants 48 hours of notice for the final driveway inspection, so we set your pour date with that visit in mind.
The same form lists other approvals that can apply: a Floodplain Development Permit in a flood zone, a Certificate of Appropriateness in the historic overlay, an NCDOT permit on a state road, and a Right of Way Encroachment agreement. The Village posts its current fee schedule, so check that before you budget. We'll tell you at the free estimate which of those your lot touches.
How much concrete your Pinehurst lot is allowed to hold
Section 9.2 of the Pinehurst Development Ordinance caps the share of a lot that can be covered by impervious surface, and the cap changes by zoning district: 24 percent in R-210, 30 in R-30, 35 in R-20, 37.5 in R-15, 40 in R-10, 42.5 in R-8 and 45 in R-5. The Village's FAQ is blunt about what counts. Buildings, driveways, walkways, patios and concrete or gravel surfaces are all impervious, and decks are not. To get your percentage, divide total impervious square feet by lot square feet and multiply by 100.
Run it on a real lot. A 20,000 square foot lot in R-20 can carry 7,000 square feet of roof, driveway, walks and patio combined. Once the house, garage and driveway are counted, the patio you sketched may be the last piece that fits. Bring your district's dimensional table and a copy of your survey to the estimate, and our concrete contractors in Pinehurst will run your number. The ordinance also warns that state watershed rules can set lower limits. R-8 carries a footnote too: a new single-story home up to 2,400 square feet under roof is allowed, but then the only other impervious surface is a driveway no wider than 18 feet, a direct walk to the front door and a patio of 64 square feet at most. Better to learn that before the forms go up.




