One inspections office for the city, Broadway and Lee County
The Inspections Division handles permitting and building inspections for Sanford, Broadway and unincorporated Lee County, and it takes applications through the CSS Portal or in person at the Sanford Buggy Company building. A lot across the line in Harnett County goes to Harnett County Central Permitting instead. Zoning is a second step. Under UDO Section 3.2.3 you need a zoning clearance permit from Community Development as well as a building permit.
The Division asks for one day's notice on an inspection and lists pours, meaning footings, mono pours and slabs, first among its daily priorities. A slab inspection happens after the forms, crushed stone, vapor barrier and reinforcing are in place and before the pour, and every filled building lot needs a subgrade compaction report from a PE. An application not paid and issued within 60 days of the invoice date counts as abandoned, and an issued permit expires six months after issuance if work hasn't started. Start on the Inspections Division page, and use our Cumberland County permits guide for the general picture. Whether a stand-alone patio needs a permit is a question for that office.
Rosemount McIver Park: a stamped driveway with a 16 foot limit
The Rosemount McIver Park Historic District has its own residential driveway rules in the UDO. Section 4.12.7 sets a driveway width of 10 feet minimum and 16 feet maximum. Surfaces must be permanent and non-erodible, which the section defines as poured concrete, asphalt, pavers or four inches of crushed stone with edging, and parking on grass or dirt is prohibited. A circular or semicircular driveway can be no more than 12 feet wide with no more than two access points, and a front-yard vehicular surface may not sit in front of the dwelling's main entrance, circular driveways excepted.
The same section requires driveway surfaces to be kept free of holes and cracks that affect safety, appearance or drainage to an adjoining property. That's reason enough to cut good joints and seal the pattern. Stamped concrete contractors in Sanford have to draw a district driveway inside that 16 feet. We'd draw a plain broom strip where the tires roll and put the pattern in the border. The UDO also has an "H" Historic Overlay and a Watershed Conservation Overlay District that can add standards, so ask Community Development which ones touch your street. The UDO index has the articles.
Decorative stamped concrete costs $12 to $20 per sq ft with color and sealer. Slope grading and extra stone are separate lines.
| Project | Size | Per sq ft | What it comes to |
|---|---|---|---|
| Backyard patio | 12x15 (180 sq ft) | $12 to $20 | $2,160 to $3,600 |
| Driveway entry strip | 10x24 (240 sq ft) | $12 to $20 | $2,880 to $4,800 |
| Residential patio with border | 16x20 (320 sq ft) | $12 to $20 | $3,840 to $6,400 |
| Large patio and walk | 400 sq ft | $12 to $20 | $4,800 to $8,000 |
A sloped yard, a floodplain pocket or a historic district width limit changes what sits under the surface price. The free written estimate after we see the site lists every line.