City lot or county lot decides which counter you use
Raeford is the Hoke County seat on US 401, 22 miles from the City of Fayetteville, so the courthouse and the county permit offices sit in town, and rural owners from the surrounding parcels come here for paperwork too. The line that matters is whether your lot is inside city limits. The county's Planning office administers zoning for unincorporated areas only, and the county ordinance leaves out land inside a municipality's extraterritorial area.
The City of Raeford lists its own Code Administration department, covering code enforcement, planning, zoning and building inspections. If your lot is inside the city, City Hall tells you where to file, and the county zoning ordinance below doesn't govern it. Out in the county, Planning issues the zoning permit and Building Inspections issues the building permit. Not sure which side of the line you're on? Call Raeford City Hall with your address before you hire anyone, get the answer in writing and send it to us so the estimate matches the counter.
Hoke County's three steps for a garage or barn
These steps are for a lot out in the county. For a residential building the county's residential page lists three steps. Environmental Health comes first for septic, and it's skipped on public sewer. Then a Zoning Permit from Planning, which asks that the building meet setbacks and not sit in a floodzone, wetlands or an easement. Then a Building Permit from Building Inspections. A plot plan is required, and it has to show the lot, the buildings and "the location and dimensions of parking and driveways."
The Zoning Permit page adds two timing rules. No land may be used or building erected until the permit issues, and the permit goes void if work doesn't start within 180 days. The county's Building Inspection page says single-family plan review usually takes 1 to 3 working days, and the cost of a permit doubles if work begins without one, so pouring first and asking later is expensive. The county's page notes there are few exceptions to the building permit requirement, so assume yours needs one until Inspections tells you otherwise.
Where the county maps a floodplain, the protection level is the base flood elevation plus 3 feet of freeboard. Our permits guide covers the neighboring counties.
Floors for barns, garages and shops are priced by the square foot, $7 to $12 per sq ft on a 4 inch reinforced pour. These sizes come straight from that range, and smaller pads hit a job minimum.
| Project | Size | Per sq ft | What it comes to |
|---|---|---|---|
| Storage shed floor | 12x20 (240 sq ft) | $7 to $12 | $1,680 to $2,880 |
| Workshop floor | 20x30 (600 sq ft) | $7 to $12 | $4,200 to $7,200 |
| Detached garage | 24x30 (720 sq ft) | $7 to $12 | $5,040 to $8,640 |
| Pole barn floor | 30x40 (1,200 sq ft) | $7 to $12 | $8,400 to $14,400 |
Fill or stone for Urban land lots, thickened edges, a long entry from the road and tear-out of an old pad change the total. Every price is confirmed in a free written estimate after we see the site.