Where a walk meets the curb, Public Works gets a vote
A walk to your front door is your business. A walk that reaches the street edge is partly the town's. The town issues driveway permits for new construction and for improvements to existing driveways, and the point of that permit is drainage from your private pavement to the public right of way. Any change that removes existing curbing needs a Public Works site inspection and approval before the permit is issued.
A Public Works representative must inspect while the work goes on, and that inspection gets booked at least 24 hours ahead. We make that call. If your new walk ties into a driveway apron or crosses the curb line, plan on this sequence. Our driveway page walks through the apron rules, and the town's own driveway permit page has the form.
The town's residential standard sets two numbers worth knowing before you draw a walk next to the driveway. The entrance can't run wider than 24 feet, and the first 20 feet back from the street connection has to be a hardened surface, asphalt or concrete. The homeowner or the contractor normally obtains that permit.




