The post's name and the name on your paperwork
The post was called Fort Liberty from 2023 to 2025. The Army announced on February 14, 2025 that it was renamed Fort Bragg, effective immediately, honoring Pfc. Roland L. Bragg of the 17th Airborne Division. Signs and documents are changing in phases, so you'll see both names in use.
The installation spans more than 251 square miles across Cumberland, Hoke and Harnett counties, and it's federal land under the U.S. Army. This page covers what sits around it: storefronts, offices, shops and church lots in Fayetteville, Spring Lake and unincorporated Cumberland County. Work inside the gates runs through the Army, not through a city permit desk. For the lot outside the gate, the first question is which jurisdiction you're standing in, because that decides the form, the fee and the inspector. Our permit guide sorts the county's offices.
One practical note for owners who lease space near the post: ask your landlord who holds the permits and the plans, and who signs the application, before a bid goes out.
Which permit desk covers a business next to the post
The post and Pope Field sit in the northern part of the City of Fayetteville, and Spring Lake's town limits include parts of it as well. Three offices handle the neighboring lots. The City of Fayetteville's Permitting & Inspections takes applications through its online E-Development Portal. The Town of Spring Lake runs its own Inspections Department. Cumberland County Planning & Inspections covers unincorporated parcels. Hoke and Harnett counties run their own offices for land on their side of the line.
Don't guess from a mailing address, because a Fayetteville address can sit in the county and a Spring Lake address can sit in the city. Pull the parcel number from the tax record and call the likely office with it. See the city permitting page for Fayetteville lots and our Spring Lake page for the town side.
Once an office confirms the parcel, ask for the answer in writing and forward it to us. A one-line confirmation from the permit desk settles arguments with landlords, neighbors and property managers, and it keeps the estimate tied to the rules that will actually apply on inspection day.
Flatwork runs $8 to $14 per sq ft for a reinforced 5 to 6 inch slab, priced per job after a site visit. These sizes multiply out from that range.
| Job | Size | Per sq ft | What it comes to |
|---|---|---|---|
| Dumpster pad | 12x14 (168 sq ft) | $8 to $14 | $1,344 to $2,352 |
| Frontage sidewalk | 5x120 (600 sq ft) | $8 to $14 | $4,800 to $8,400 |
| Shop apron | 24x30 (720 sq ft) | $8 to $14 | $5,760 to $10,080 |
| Lot section | 40x60 (2,400 sq ft) | $8 to $14 | $19,200 to $33,600 |
Curb cut closure, ADA ramps, sidewalk connections, stormwater review and tear-out of old pavement can move a total near the post. Every price is confirmed in a free written estimate after we see the site.
What a Fayetteville commercial driveway site plan has to show
Inside the city, a commercial driveway needs a permit, and the site plan has to show specific things. Driveway radii of at least 20 feet. Closure of any existing driveways or curb cuts. Sidewalk along the property frontage on a public road. Sidewalk connections, ADA ramps and crosswalks where required. The city's guide lists the fee at $200 for a site under 75,000 square feet and $400 above that.
The Unified Development Ordinance adds that a new curb cut is reviewed and approved by the City Manager before a building permit is issued. And Fayetteville streets belong to either the city or NCDOT: on a state street the City Traffic Engineer endorses the application, then you take it to NCDOT for final approval. Homeowners are a different case. A commercial driveway permit isn't required for an owner-occupied single-family home or duplex, so don't let a neighbor's advice about a home driveway steer your storefront plan.
Fees and rules change, and the city's online guide is the place to read the current version before you budget.




